Wednesday, April 26, 2017

04/19 to 04/26

This past week we've made progress in making sure to have all parts manufactures and assembled for next week. We had a half-scale team meeting to collectively plan out what the goals for each team would be. We plan on having the braking mechanism ready to mount and test by the end of next week and also plan on having the bevel gears, motors, and other parts in our hands to complete mounting them to the bogie.

 Braking mechanism for one side of the bogie, partly assembled.


Checking to see that the motor can mount directly to braking mechanism.

Wednesday, April 5, 2017

03/22 - 04/05

These past weeks we have been working on the redesigned brake for the bogie.
The motor (circled in blue) will pull a wire which will in turn pull the brake lever back, against a spring. Once the spring moves back to original position, the brake lever rubs against the wheel (circled in red) and slows down the wheels. We plan on testing different materials that the wheel rubs against (aluminum, or rubber) and also have plans on testing the wire used to pull the lever back as we need to determine if it can be flexible enough to wrap around the rod.

We have most of the materials for the brake design, we still need to purchase some machine tools. We are awaiting for the propulsion motors and gears in order to progress with propulsion. We plan on having the motor mounts soon.






Tuesday, March 21, 2017

03/15 to 03/22

We have decided to move away from using the brake calipers against the bogie railway. During last presentation some issues regarding switching and how the calipers might hit the rail proved to be a valid problem. Furthermore, the structure of adding hydraulic system was something that created some difficulty as well. We are looking to design a brake system that would function as both fail safe and normal braking for the bogie. The lever will be controlled by the motor and will feature a spring load that will force the lever down. The lever itself will be connected to brake pads that will come in contact with the wheel. We are currently working on models and calculations for this design. Furthermore, upon further discussing with the rest of the subteams, the wayside team noticed that they might need space for their redesign which will be in close proximity to our new brake design. We will be working closely with them to make sure our systems do not interfere with each other. This new brake design would require more metal, springs, and possibly cable wires. The springs and wire should be pretty cheap, depending on the final design. As for the metal, Craig has access to a limited supply, and any purchase of additional metal should not be expensive.

Tuesday, March 14, 2017

03/08- 03/14

This week the fabrication for the motor mount has begun. Additionally, we are reconsidering altering the brake design to better suit the bogie and the track. We await the motors for propulsion to begin testing but are attempting to complete components for braking and test braking by the end of March.

Tuesday, February 28, 2017

02/22/17 to 03/01/17

This week we worked on our initial presentation of the spring semester. Earlier we were concerned whether or not we would be able to find motors to satisfy our specifications for the bogie. We spent time making trying to find motors suitable for our design at lower prices but ultimately couldn't find anything within our sponsors or immediate contacts.

We spent last week speaking to Spartan Superway treasurer to make sure that our most expensive parts (motors and miter gears) were included in the Associated Student application for funding. AS funding should be able to cover the expense of buying our two motors and four miter gears for propulsion. Craig has provided brake calipers and more materials for manufacturing the mounts of the brakes and motors which drove the total cost of our design down.

For the next weeks we plan on acquiring a master cylinder and any tubing to test the brakes.